合作伙伴 |
|
|
|
Tuancheng
Environment Engineering Research and Design Center

Introduction:
The technology research and engineering design for environmental
prevention and management project is one of important services of
Tiancheng E.P.company which including technology design, civil engineering
design, electric design with the state qualification (second grade).
With the close cooperation of dozens universities from the east
China area, the design institutes, the Shanghai Environmental Protection
Bureau and the Water Business Bureau, we have organized a technical
team with the talent people of well-knit academic base、professional
technical skill and plenty practical experience for research and
design of various wastewater and wastegas, and know new technology
& equipment development by the internet. Tiancheng Environment Engineering
R&D Center is enlarging the work fields by full of energy for accommodating
the needs of the market. Hopefully, we can provide full services
for clients by the particular e.p. technology and excellent work
for winning the trust and support of the society. The development
aim of Tiancheng Environment Engineering R&D Center is, widely suck
the newest scientific research achievements from international environmental
protections, learn from the first-class domestic and oversea companys
and scientific research institution in an open mind, further the
development of Tiancheng.E.P in environment field by continued environment
alteration of china, make Tiancheng E.P becoming a intellective
and constructive group by all great efforts.
|
|
Business
range
|
1、Technology
research
|
| Integration
analysis:
The
first thing we should to do when undertaking a environment porject
is to learn the status of the production characters, the production
process, the raw materials and the quality & quantity of water(gas)
as possible as we can. To know fairly well the pollution components
and then constitute the test research scheme as per the environment
evaluation book(table).
|
|
Test:
On
the basis of knowing fairly well to the quality and quantity of
water(gas)of the factory, to constitute the test research scheme
and then carry the test to validate and perfect the technology process
for gaining the first hand treatment parameters so that to complete
the project design by proportion blowup.
|
|
Project
design:
Project design is the text of the integration analysis and test,
including the technology process, the analysis of treatment difficulty
and corresponding countermeasures、setting size、equipment type selection、budgetary
quotation、follow-up service etc. |
2、 The design of wastewater
treatment engineering
|
| The
pharmaceutical wastewater treatment is a difficulty in the industry
wastewater treatment. In the course of cooperation with Shanghai Pharmaceutical(Group),
our company accomplished many high difficult treatment projects of
pharmaceutical wastewater and found out a set of effective treating
way. In recent years, the wastewater treatment projects we have accomplished
are: SH Pudong Pharmaceutical Factory,SH Xuhang Pharmaceutical Factory,SH
Tianping Pharmaceutical Factory,SH Shenxing Pharmaceutical Factory,SH
Dongfeng Pharmaceutical Factory, Huaihai Production Base for the raw
material of SH Pharmaceutical Group. Thereinto, ever be praised highly
for the caffein wastewater treatment project of SH Shenxing Pharmaceutical
Factory by <> in January 29,2001.
|
The treatment project of high density chemistry wastewater
For the
treatment of high-concentration chemical wastewater, we adopt the
way of branching off the clean & waste water and strengthen the
pretreatment,then by the combinative way of physical chemistry and
biochemistry,the question of high-concentration chemical wastewater
treatment is settled by us successfully. In recent years, the projects
we have accomplished are: SH Chemical Industry Co., Ltd.,SH Shuangle
Grease Chemical Co., Ltd.,SH Changzheng No.2 Chemical Co.,Ltd...
|
|
|
The
treatment project of surface treatment wastewater Since
the rapid development of electroplating industry, the surface treatment
wastewater is another kind of wastewater we met. Basing the characters
of much plating types of the surface treatment workshop and complicated
wastewater components and following the principle of wastewater division,
separate pre-treatment & integrative treatment processing and
the discharged water reusing, the surface wastewater treatment is
settled by us properly. In recent years, the projects we have accomplished
are: SH Viasystems Electron Co.,Ltd.,Wuxi Nicety Steel Tube Factory,Kunsan
Nanya Electron Group, Kolbenschmidt Pierburg Shanghai Nonferrous Components
Co.,Ltd..
|
|
|
The
treatment project of living wastewater We
adopt advanced and mature treatment technology, select reliable and
dependable equipment to treat the living wastewater which cannot flow
into city sewage treatment plant. The projects we have accomplished
are: SH Viasystems Electron Co.,Ltd.and SH Yongli House Property Co.,Ltd..
|
|
|
Other wastewater treatment engineering
Other
wastewater treatment projects we accomplished in recent years are:
Sichuan 405 Factory, SH Gaoya Glass Co.,Ltd., Wuxi Crude Weave Co.,Ltd.,
Wuxi Allied Printing and Dyeing Factory, Wuxi Shuideng Mechanism Co.,Ltd.
etc.
|
|
|
3、The design of the waste gas treatment
porject
|
The
Spray-painting and solidifying waste gas treatment project:
In process of spray-painting and solidifying,
abundant of organic waste gas will be generated. We use the facility
of cleaning and resuming organic solvent steam with wet and dry way
paint mist treatment by the successful experience from foreign and
domestic. We great accomplish the waste gas treatment project of Wuxi
Meideng Paint Material Factory.
|
The
toxic & harmful gas treatment project:
In
the process of industry production, some toxic and harmful gas will
be generated. By mature technology, we successfully accomplish the
treatments of acid mist of Wuxi Stainless Steel Factory and SO2 of
Shanghai New Long March Fine Chemical Engineering Co.,Ltd. and the
discharging reaches standard level.
|
The
industry aeration & removing dust treatment project:
In the process of carpentry, a
large numbers of powder dust and heat will be generated. In order
to protect the health of the workers,we must aerate plenty for removing
the powder dust in the air. We offer the perfect scheme of economic
air displacement, effective capture rate and first-rank pipeline design
for the setup of removing dust system ofJiading Furniture Factory.
|
4、The
design of noise control |
The
treatment of machinery noise: The dropping treatment of the high-noise
equipment is a aspect of environment treatment engineering. We setup
the damping setting、muffler、sound insulation cover etc for these equipments.
The treatment of
machine pump room noise: Machine pump room is the lumped place of
all kinds of equipment,so it is a main place of noise pollution. In
order not to influence the normal work emotion of the workers and
daily life of residents around,we use sound insulation construction
material to build the machine pump room and set up noise elimination
shutter etc.
|
5、The design of equipped electric
|
| E.P.
Engineering Design Charge Standard
|
一、Charge
Basis
“Project reconnaissance design charge standard” (2002 modified version)
二、Charge Formula
1. design fee = basic engineering design fee ×(1±floating value)
2. basic engineering design fee = basic design fee + other design
fee
3. 3. basic design fee = engineering design basic fee×specialty adjustment
factor×engineering complexity factor
Where: Floating value —— Decide by the project provider and the designer
according to the actual situation.;
Other design fee——Refers to the engineering design fee according to
the engineering design actual need or the corresponding service fee
requested by the project provider including the system design expense,
the design coordination expense, documentation expense of the non-standard
equipment design, budget establishment expense of the construction
drawing, establishment expense of completion chart, etc.;
Specialty adjustment factor——1.00;
Engineering complexity factor——It is 1.15, if the engineering complexity
of environmental protection project is rate Ⅲ.
三、Basic Engineering Design Fee
| |
|
Basic Fee(Y10k) |
Rate(%) |
| 1. |
200 |
9.0 |
4.50 |
| 2. |
500 |
20.9 |
4.18 |
| 3. |
1000 |
38.8 |
3.88 |
| 4. |
2000 |
71.3 |
3.57 |
| 5. |
3000 |
103.8 |
3.46 |
| 6. |
4000 |
133.9 |
3.35 |
| 7. |
5000 |
163.9 |
3.28 |
| 8. |
8000 |
249.6 |
3.12 |
| 9. |
10000 |
304.8 |
3.05 |
| 10. |
20000 |
566.8 |
2.83 |
| 11. |
40000 |
1054.0 |
2.64 |
| 12. |
60000 |
1515.2 |
2.53 |
| 13. |
80000 |
1960.1 |
2.45 |
| 14. |
100000 |
2393.4 |
2.39 |
| 15. |
200000 |
4450.8 |
2.23 |
| 16. |
400000 |
8276.7 |
2.07 |
| 17. |
600000 |
11897.5 |
1.98 |
| 18. |
800000 |
15391.4 |
1.92 |
| 19. |
1000000 |
18793.8 |
1.88 |
| 20. |
2000000 |
34948.9 |
1.75 |
Note:If the range is greater
than Y20000000k,the rate is 1.6%.
|
|